3000L Beer Serving Tank
- YUXIN
- China
- 30-40 days
- 300 sets per year
carbonation port and stone
liquidometer
sample valve
pressure valve and gauge
safety valve
3000L Beer Serving Tank
Bright beer tank, often called beer brite tank, serving tank or maturing tank, the bright beer tank is the vessel in which beer is placed after primary fermentation and filtering(not all the beer needs filtering, it's optional), so it can future mature, clarify and carbonate, as well as be stored for kegging, bottling, canning and packaging, In brewpubs, bright beer tanks can even do double duty as serving tanks. YUXIN Equipment offers Bright beer
Product Name | Stainless steel horizontal bright beer tank storage beer serving tank 1000l |
Function: | Bright beer tanks are used to store beer. |
Type: | Horizontal stacking |
Inner shell: | 304 stainless steel 3mm thickness |
Outer shell: | 304 stainless steel 2mm thickness |
Surface Treatment | Polishing 0.4-0.6μm. No dead ends |
Insulation: | 80mm polyurethane |
Cooling jacket: | Dimple plate jacket 304 stainless steel, thickness 2mm |
Test: | With strict water / air pressure test,air pressure test for 48 hours before delivery |
Type of head: | Dished head |
Manway: | side or top manway |
Accessories:
| Sample Valve ; Pressure relief/vacuum valve ; Temp. sensor / thermometer ; Carbonation Stone ; CO2 port; Bottom outlet with butterfly valve ; Spraying Ball with down tube ; Stainless pipe legs with adjustable footpads ; |
Details:
Packaging & Shipping
Air bubble film, stretching membrane, steel shelf, free-fumigation wooden box, to make everything safe in containers. Suitable for long distance sea transport packaging.
Reference
Up to now, YUXIN equipment has been exported to Russia, USA, Australia, Korea, Europe and other more than 20 countries. For more contact information of our customers, please send us a email.
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory and welcome to visit us at any time.
Q: How long is your delivery time?
A: Generally single tanks need 30-40 days, for whole plant need 40-50days.
Q: Do you have CE and UL certification?
A: Yes.
Q: What is your terms of payment ?
A: 40% deposit and 60% before delivery.